Operation EPC

Operation EPC

Operation EMC For the projects with reasonable A/C system design and installation, BROAD takes over all the cost, including chiller energy cost, chiller and terminal units' maintenance cost. This way, BROAD can save 5%-20% operation cost compared with conventional operation method by......

Send InquiryChat Now

Operation EMC

For the projects with reasonable A/C system design and installation, BROAD takes over all the cost, including chiller energy cost, chiller and terminal units' maintenance cost. This way, BROAD can save 5%-20% operation cost compared with conventional operation method by customer.

BROAD EMC

The purpose is to save energy and cut cost;

The base is energy saving products;

The feature is investment and retrofitting;

And protect customers' interest by contracts.

Service Quality

1.No chiller break down during A/C supplying season.

2.No temperature or flow insufficient accidents, with stable supply water temperature and flow rate.

3.No A/C supply incident when indoor temperature reaches the setting value.

4.No excessive charge, with transparent energy price and charging according to contract.

FAQ

Q: Do you make ammonia absorbers that use ammonia?

A: No, BROAD only focus on the absorption chiller with LiBr solution. No plan to make ammonia absorbers.

Q: What's the refrigerant of absorption chiller?

A: Distilled water. 

Q: Lead Time

A: In general, 22 weeks door to door after release and up to 13 weeks in special circumstance.

Q: Clearance Dimension

A: Please contact us.

More details,please click here:


Hot Tags: operation EPC, China, suppliers, manufacturers, quotation
Related Products

24 hours at your service:

International@broad.net

Newsletter

  • TRY BEST! TO BE NO.1

    We possess a modern factory building of 70,000 m2, more than 1,800 sets of production devices, 6 world's largest assembly lines for non-electric chillers.

  • QR CODE